字典APP>英语词典>impounding翻译和用法

impounding

英 [ɪmˈpaʊndɪŋ]

美 [ɪmˈpaʊndɪŋ]

v.  暂时没收; 扣押; 收留(待领的狗、猫等)
impound的现在分词

柯林斯词典

  • VERB 扣押;没收
    If somethingis impoundedby policemen, customs officers or other officials, they officially take possession of it because a law or rule has been broken.
    1. The ship was impounded under the terms of the UN trade embargo...
      该船因触犯联合国贸易禁运条款而被扣押。
    2. The police moved in, arrested him and impounded the cocaine.
      警察冲进去将他拘捕并没收了可卡因。

英英释义

noun

双语例句

  • Meshif is an honorable man, but I fear that he is growing impatient with me about impounding his ship.
    马席夫是一个十分正直的人,但是我害怕他对于我拘留他的船而越来越没耐性。
  • Periodic impounding and draining of the water reservoir would be implemented after the projects were in service.
    在水库工程运营后,将按计划进行周期蓄、排水。
  • Verification on Some Key Technical Decision-makings through the Trial Impounding of Three Gorges Project
    三峡工程试验性蓄水对若干技术决策的验证
  • The Taiwanese researchers say the impounding effect of dams and reservoirs has concealed the real extent of ice melt.
    台湾研究员表示,大坝和水库的蓄水,掩盖了冰层融化的真实规模。
  • The main problem on simulation of tectonic stress field after reservoir impounding in the head area of the Three Gorges is the influence of "canyon effect" and "rock soften".
    迄今为止,长江三峡库首区蓄水对上地壳构造应力场影响的数值模拟研究中存在的最大问题是未考虑地形“峡谷效应”和库水下渗导致“岩石弱化”的影响。
  • Before the impoundment of the Longtan reservoir, Longtan Digital Seismic Network has been operated. After the impounding, a great deal of earthquakes occurred around the reservoir. So Longtan reservoir is chosen as the objective region to study in the thesis.
    龙滩水库蓄水前数字地震台网已正式投入运行,蓄水后在库区发生了大量的中小地震,因此本论文选择龙滩水库作为研究的场所。
  • The result shows that this model can effectively coordinate the benefits of flood control, power generation and transportation of the Project in the process of impounding.
    结果表明,优化设计能权衡防洪与兴利之间的关系,充分挖掘汛初与汛末的潜力,提高三峡水库运行初期的综合效益。
  • As of now I'm impounding all of this.
    现在我要将所有这些都扣留。
  • Study on the Impact of Overhead-erection Ramp Wharf after the Impounding Water of the Three Gorges Reservoir
    三峡蓄水对内河大水位差架空斜坡道码头的影响研究
  • On this basis, the start impounding time and water storage program can be study comprehensively in the future.
    今后可在此基础上继续深入全面研究,进一步提前蓄水开始时间和加快蓄水进度。