redone
英 [ˌriːˈdʌn]
美 [ˌriːˈdʌn]
v. 重做; 换一种方式做
redo的过去分词
BNC.46349
柯林斯词典
- VERB 重做;返工
If youredoa piece of work, you do it again in order to improve it or change it.- They had redone their sums.
他们已重算了一次总数。
- They had redone their sums.
双语例句
- Ball physics have been redone from scratch this go round so the ball will spin, bounce and generally move how it should.
球的物理因素被重新制作,这样球将旋转,反弹和整体地按照应该的方向运行。球从地址上反弹回来。 - Eighty-one-year-old Mickey, one of the most familiar Disney character ever, has been redone to star in a new video game, Epic Mickey.
81岁的米奇可以说是迪士尼史上最广为人知的角色。在新款电子游戏《传奇米老鼠》中,米奇将以全新形象出现。 - It had been redone on the cheap in the late1970s, and the space was not used well.
它一直重做了70年代末便宜,空间没有很好地利用。 - The extensibility of the XML is lost, as the entire database design must be redone to accommodate the addition of new elements or a format change to any elements.
XML的可控制性完全丢失,因为整个数据库设计必须重新进行,以容纳额外的新元素或适应任何元素的格式变化。 - Before two hours of administration with TAA, each rat in group A and group B were given normal saline 1ml/ 100g weight, and the left were given the same volume/ weight medicine respectively, then redone every 8h.
在TAA首次造模前2h,A、B组每只大鼠灌胃生理盐水1ml/100g体重,其余各组给等体积/重量比的相应药物。以后每8h重复给药一次。 - In the process of devising and developing teaching auxiliary platform, investigation and analysis should be done on the current teaching auxiliary system first of all, after finding the shortcomings existing in the practical application, the analysis of the system 'needs should be redone.
在教学辅助平台的设计与开发过程中,首先对学校已有的教学辅助系统进行了调查分析,找出其在实际应用中存在的不足,从而根据这些不足重新进行了系统的需求分析。 - We just had it redone.
我们刚为你整理过了。 - I've completely redone our compiler specs in a much better format.
我用一种更好的格式重写了编译器配置。 - In most cases, most of the work is committed and does not have to be redone.
多数情况下,大部分任务已提交,不需要重做。 - In case of any interruption during the test without approval by the tenderee, the test shall be redone and any responsibility for factory acceptance delay and cost arising therefrom shall be borne by the bidder.
试验期间,发生未经招标者认可的中断,则试验将重新开始,由此造成的工厂验收时间延长的责任和费用应由投标人承担。
